Dulles Corridor Metrorail Project Construction Photos 04 18 2009


The only actual real construction on the project that is taking place is in the area of the portal west of the future Tysons Central 123 (Tysons Corner Center) Station. Some tree clearing has been done along the Dulles Connector Road adjacent to the interchange with VA I-66. Most of the rest construction taking place is utility relocation with the exception of the work being done in the VA-123 Chain Bridge Road VA I-495 Capitol Beltway Interchange. That work is a separate project, Virginia I-495 Capitol Beltway HOV/HOT lane project.

The best locations for taking pictures and viewing the project along VA-123 Chain Bridge Road west of the Capitol Beltway is from the WestPark Drive overpass and Tysons Corner Center parking deck E and to a lesser extent parking deck D. The east end of Leesburg Pike part of the is best viewed from the VA-123 Chain Bridge Road overpass. There is a terrace behind 8444 Westpark Drive that might be a good viewing location along Leesburg Pike west of the future Tysons Central 7 (Pike Seven Plaza) Station. Will have to check out that location on next visit.


VA I-66 atVA-267 Dulles Connector Road.


North side of VA-123 Dolley Madison Boulevard between Anderson Road and Old Springhouse Road.


I-495 Capitol Beltway VA-123 Chain Bridge Road VA interchange.


VA-123 Chain Bridge Road at Tysons Boulevard. Tyson Central 123 (Tysons Center) station.


VA-123 Chain Bridge Road at Tysons Boulevard. Tyson Central 123 (Tysons Center) station.


VA-123 Chain Bridge Road at Tysons Boulevard. Tyson Central 123 (Tysons Center) station.


VA-7 Leesburg Pike looking west from VA-123 Chain Bridge Road overpass. Future Tyson Central 7 (Pike Seven Plaza) station.


Metro Control Survey KDX 117 south end of southbound VA-7 Leesburg Pike bridge over VA-267 Dulles Connector Road / Dulles Access Road.

23:59 05 19 2010

© 2010 John R Cambron