WMATA: Dulles Corridor Metrorail Project Pictures 05 07 2011,
Fall Church Yard lead tunnel



VA-267 West portal of Fall Church Yard lead tunnel.


VA-267 VA I-66 K route Flyover west abutment track N2 and west portal of Fall Church Yard lead tunnel.


VA-267 VA I-66 K route Flyover track N2 and and west portal of Fall Church Yard lead tunnel.


VA-267 West portal of Fall Church Yard lead tunnel.


VA-267 Retaining wall outside of west portal of Fall Church Yard lead tunnel.


VA-267 trees cleared in preparation for tunnel excavation west side of inbound roadway, surveyor stakes locate perimeter of excavation.


VA-267 trees cleared in preparation for tunnel excavation west side of inbound roadway, surveyor stakes locate perimeter of excavation.


VA-267 Shoring piles of Fall Church Yard lead tunnel left side of roadway to west portal.

0813 06 06 2011

© 2011 John R Cambron

Home