|
Here it is fresh off the trailer and right out of the barn!

Looks like some welding is in order...

Three coats of primer, drysanded and then reprimed and ready for paint.

This '67 Firebird once had a vinyl roof. Therefore, the rear window valance was totally rotted and there
were holes in the roof. The shell was completely sanded to bare metal- all patch work was performed and new valance
was installed.

Body work and primer, rear quarter...

3 coats of Sikkens single-stage black, sanded once more, then recoated with 2 more coats for the final color.

|
 |
|
Time for a new heater channel!

After completely disassembling, we began the body work, grafting the rag, welding in driver's heater channel, package
tray, lower rear quarters, bumper brackets, etc....
Plastic work done, ready for primer.

After wet sanding primer, 3 coats of Sikkens single-stage Jade Green (L349)

Another shot of the '67...

3 coats primer, then dry sanded and then one final coat, wetsanded before paint.

rear end picture after wet sanding, buffing and assembling.

|
 |
|
|
 |
|
|
|