|

interior before shot

removalof the old hoses

enigine right side shot, after clean up and detailing

engine left side shot after clean up and detailing

roof ventilator repair

inside shot

interior ventilator flapper door

data plate, delivered 8-22-42

firewall junction block wiring before shot

gas pedal and steering mast plate

starter transfer switch- now on to rewiring the truck

battery box removed-before shot

battery box frame work after shot, just waiting for the box to be rebuilt
|
 |

parked outside the shop

drivers side brace leg repair -the pin was frozen,it was cut off, broken loose and rewelded

new bracket fabricated for "J" tow bar

front bracket fabricated

ventilator removed for repair and painting

underside shot

with screen

toeboard before shot-5 layers of paint

toeboard underside shot

after shot, ready for final paint

ready to be reinstalled

battery box removed, need to put a new floor in it

battery box rear shot-before
|