Home | "Before" Construction | "During Construction" | Finished BGE Outdoor Kitchen | BGE cooks

SSN686's BGE Site

Finished BGE Outdoor Kitchen

Below is a picture with the lighting that will be near the Eggs.  There are also electrical outlets (silver box to the left and right of lighted area) if I need to plug in anything.  All that is left is the screening to be installed on the two walls in the picture (behind the counters) and then move the Eggs and supplies.  That should happen this weekend!
 

elec.jpg

closeregg.jpg

FINALLY!!!  Moved the eggs over this morning. 

drawer1.jpg

Drawers for storing platesetter & other items.

horzeggs.jpg

Ready for the weekend!  Now what to cook?

drawer2.jpg