|
|
 |
|
You might find all the information you want on this web site, but if not, register with us using the navigation bar on
the left, and get technical details, white papers and other information. Of course, you are always welcome to contact
us directly.
|
 |
Link to the following information:
(You need Adobe Reader to view some of these files. If you don't have it, click this link to download Reader for free.)
WAM AL II Technical Data
Photo Show
(This is a 3.6 mb Adobe file, and is only recommended for high speed internet connections)
|
 |
|
Installation Information
WAM AL II is very user friendly. Standard packaging is 55 pound bags, and bulk packaging is available. Water
is the only thing that has to be mixed with the material in the bag, and mixing time is only a minute or two. It is
designed for vibration casting at about 15% water addition, but there is plenty of room for field adjustment to suit
installation conditions. The curing process is exothermic and will complete in 4 to 8 hours. A straight
ramp heat up to facilitate drying is required, and the ramp up can generally run at about 30 degrees F per hour. contact
your WAM representative for specifics.
|
 |
|
|
 |
|
|
|
|
|
Westmoreland Advanced Materials, LLC
110 Riverview Drive
Monessen, PA 15062
|
|
|
 |