Master Bedroom Before
There was so much wall paper in here we decided to use 1/4" drywall and
install it over the old drywall.
Master Bedroom After
New
ceiling fan, crown molding, new base molding, new carpet and paint
Vanity Area Before
Notice the closed in area where the florescent lights use to be
(ceiling) Can Lights will be installed. New electrical in
vanity
area.
Door and entry to the Water Closet. Shower and Toilet area. And the
ugly wallpaper.
Vanity Area After
New tile floor, crown molding, cherry vanity and cherry mirrors, new
door, and new closet doors after the closet soffit was dropped to
accommodate them. New lights over mirrors and florescent
light was taken out,
area filled with new drywall and can lights installed. All light
fixtures are on dimmers.
Still a little dust, and a Porter Cable battery charger, but you get
the idea!
This mirrored wall soffit was dropped so we could install the shorter
length mirrored doors. It had gold floor to ceiling mirrored doors from
the beginning.
Shower and Toilet Area Before
New copper installed and walls down to the studs. Notice the ugly wall
paper.
Shower pan and Dam Wall with new liner and drain installed. That level
is dead on level!!
Toilet area without the toilet. Also look at all the different layers
of Wallpaper.
This is pretty much what the whole house looked like.
Shower after
Hard to get complete pictures of this shower. Room is a bit small.
No more wall paper!
Customer is going to install the towel bars and the rest of the
fixtures. I have moved on to the Kitchen.
New Walk in Closet built off the back patio. You enter it through the
old mirrored closet door area.
No before pictures here, this is a new room built off the old master
bedroom closet.
This was the old closet area, now its the new opening to the new walk
in closet.
There is still some pick up work to do, install door handles
and of
course take
the tape off the doors. We used the Closet Maid system and
track lighting.
Now for the before Kitchen Pictures!!!
Well I have my work cut out for me.
All Kitchen Cabinets will be removed and replaced, frame in door
openings, remove ceiling joists and raise to current ceiling height.
Can lights installed in place of old florescent lights, eating bar will be
moved out a couple of feet to extend counter area. Under cabinet
lighting installed under wall cabinets. Granite or Quartz counter top
and tile back splash installed. Oak flooring installed in Kitchen and
Dinning Room.
Kitchen Demo to studs


Ceiling has been raised and new can lights installed

All new drywall and plumbing. The match between old ceiling and new will
disappear once its textured and painted.Doorway on right has
been closed
and new gas line and water line run for gas cook top and new
refrigerator
location. All lights will be on dimmers and under counter
lighting will
be installed once wall cabinets are in.
THE FINISHED KITCHEN !!!!!!

The granite has been installed.. Finished the travertine back splash,
under counter lighting and electrical covers installed. Floor is solid
maple,
stained dark.


Notice the raised granite shelf behind the faucet.
I love this faucet!!


Accent under counter lighting and Travertine stone back splash

LIVING ROOM BEFORE AND
AFTER
Not many before pictures of this room, it was covered with
wallpaper.



The brick and wood on this wall wraps around to the
fireplace.

Fireplace now covered with tile, drywall and new bookcase
started

New Custom Bookcase without the cabinet doors installed

Some of
the custom mantel detail. I will be adding more pictures
of the finished Living Room in the near future.

ADDITIONAL PICTURES OF
OTHER WORK ON THE SAME HOUSE
Rec Room, Bonus Room, Game Room or whatever it's called these days.

Wish I had taken a before picture of this room but this was the room
used to store all furniture and housewares from other
rooms during the remodel. The walls had layers of ugly
wallpaper,
this corner had a pot belly stove with real brick back wall. The
ceiling had four 6x8 beams and the floor was half carpet and a water
damaged wood floor.

I took out 6x8 beams and installed new drywall over old drywall. This
was originally the garage and was converted to Rec. Room years ago.
When looked at from the street you cannot tell it was a conversion.
Installed crown molding, paint, new electrical receptacles and switchs,
checker board ceramic tile and Attic Fan. I still have to install the
trim and ceiling light fixtures.
BACK PATIO
This area was suppose to have been done by another Contractor but he
didn't finish, and eventually ripped off the homeowner of a
considerable amount of money. Other contractors job consisted of, new
patio cover and new deck off pool area. I originally was not going to
do any outside work only because I was busy on the inside of the house.
The homeowner asked if I would complete what had been started. The old
surface was astro
turf glued down to concrete slab. It all had to be
removed which
was a job in itself.

800 Sq. Ft. of Tile on Back Patio


Finished Tile on Back Patio. Stucco and House Still Needs Painting