List of Exemplary Projects with Reference Contacts Included
REFERENCE #1
Client: Department of Public Works, AE Division, 900 S. Fremont Ave. Alhambra CA
Client Contact Info: Peter Chang, Project Manager , Phone #626-458-7822
Project Name: New Dominger Drain and Pump Station
Owner: Los Angeles County of Public Works
Basic Scope of Work:
Develop new state of the art pumping station, complete, from utility coordination, power distribution, lighting, telemetry,
PLC station controls, motor controls, security, fire alarm, poison gas detection, and varied emergency systems. Review
and recommend approval of builder's electrical submittals for all components.
REFERENCE #2
Client: MMC, Inc., 8405 Artesia Blvd., Buena Park CA 90621
Client Contact Info: Jay Mehta, Owner , Phone #714-521-2440
Project Name: Ulmus Drive Sewage Pump Station Renovation
Owner: Los Angeles County of Public Works
Basic Scope of Work:
Furnish electrical design to replace existing small pump station with new enlarged pump station. Review and recommend approval
of contractor’s electrical submittals inclusive of power lighting and controls components.
REFERENCE #3
Client: Frank Webb Architects, 8607 Venice Blvd., Los Angeles, CA 90034
Client Contact Info: Frank Web, Principal, Phone #310-559-4717
Project Name: 3rd Floor Medical Surgery Renovation
Project Location: USC University Hospital
Basic Scope of Work:
Convert existing 40,000 square feet Psychiatric Ward into new Post-Operation Medical Bed Ward. Upgrade normal and emergency
power within area. Upgrade lighting, nurse call, fire alarm and master antenna television systems. Power specialty head wall
units.
Client: Frank Webb Architects, 8607 Venice Blvd., Los Angeles, CA 90034
Client Contact Info: Frank Web, Principal, Phone #310-559-4717
Project Name: Construct new Operating Room #5
Project Location: Norris Cancer Institute
Basic Scope of Work:
Construct new operating room and install new electric humidifiers and humidifier controls. Provide new normal and emergency
power. Phase construction to maintain services to operating room areas not being affected.
REFERENCE #4
Client: Bellwood General Hospital, 10250 E. Artesia Blvd., Bellflower, CA 90706
Client Contact Info: Frank Peralta, Director of Plant Operations, Phone #562-920-5042
Project Name: Electrical System Analysis and Report
Project Location: Bellwood General Hospital
Basic Scope of Work
Study hospital electrical system and document code violations, power quality and loading problems, emergency generator
loading, grounding and electrical safety issues. Document and recommend corrections.
Client: Bellwood General Hospital, 10250 E. Artesia Blvd., Bellflower, CA 90706
Client Contact Info: Frank Peralta, Director of Plant Operations, Phone #562-920-5042
Project Name: Electrical System Reconfiguration and Modernization – Phase 1 & Phase 2
Project Location: Bellwood General Hospital
Basic Scope of Work
Reconfigure hospital electrical system to comply with latest electrical codes. Included installation of new modern SCE
service. Rerouting of SCE 16KV feeder from overhead to underground. Replace completely normal and essential systems (critical,
life safety, and equipment branch of emergency system). Replace all major hospital feeders. Reconfigure terminals of 500KW
generator. Replace all 240V motor loads with new 480V motors and provide new motor and HVAC controls. Upgrade fire alarm system.
REFERENCE #5
Client: Cannon Architects (reorganized into Cannon Dworksy)
Client Contact Info: Norman Soto, Principal, Phone #(609)-452-8888 (now at the Hillier Group, Prinston N.J.
Project Name: West Valley Imaging Center
Project Location: West Covina, CA
Basic Scope of Work:
Construct new 30,000 square foot diagnostic imaging center. Center included state of the art MRI using super cooled electro-magnet
and varied radiographic systems. Required installation of new SCE service, 250kW emergency generator, normal and emergency
feeders, 150KVA redundant Uninterruptible Power Supply (UPS), centrifugal chiller dedicated for cooling of MRI magnet, chilled
water and hot water pumps and controls, lighting, fire alarm, public address, direct current power supply for MRI lighting
and other special features.
Client: Cannon Architects (reorganized into Cannon Dworksy)
Client Contact Info: Norman Soto, Principal, Phone #(609)-452-8888 (now at the Hillier Group, Prinston N.J.
Project Name: Upgrade Central Plant & Surgical HVAC System
Project Location: Encino Hospital, Encino CA
Basic Scope of Work:
Renovate central plant to include new pumps, controls VAV drives, replacement of chillers and high pressure boilers. Provide
new normal and emergency feeders. Install new 250KW generator and reconfigure critical, life safety and equipment branch of
essential system.
REFERENCE #6
Client: Jack Bryant Engineers
Client Contact Info: Jack Bryant, Owner, Phone #(609)-452-8888 (now Charles Abbott & Asso., Torrance CA)
Project Name: Construct Rolling Hills Plaza
Project Location: Crenshaw and Torrance Blvd., Palos Verdes Encino Hospital, Encino CA
Basic Scope of Work:
Completely demolish outdated mall facilities and construct new regional strip mall with approximately 12 major establishments
and numerous smaller establishments. Prepare design for electrical site work for new mall facilities. Coordinate with SCE
in rerouting 16KV underground feeders, demolition of SCE transformers and underground structures, and installation of new
SCE transformers and structures. Prepare service calculations for all establishments, determine placement of services and
coordinate with SCE for service installations. Design parking lot lighting and assist in design of decorative architectural
lighting.