Why Improvements?
 
One of the special things at Retama Village are the coach houses. Each of the Phase 1 RV lots come with a 12x20 unfinished shed. The exterior is covered by CCR's, but the inside is yours to do with as you please. Some have turned it into sitting rooms, others have made it a motorcycle garage. I'll turn ours into a two person spa.

RetamaCoachHouse3902.jpg
3902 Mallard Lane

Framing
 
The first task is framing. I'll put in a full double step box tray ceiling, a curved seperation wall, and a separate bathroom.

RetamaCHFrontFraming.jpg
Front Side

RetamaCHBackSoffet.jpg
Back Side

RetamaCHLayoutL.jpg
Spa Left

RetamaCHLayoutR.jpg
Spa Right

RetamaCHCurveL.jpg
Curved Wall Left

RetamaCHCurveR.jpg
Curved Wall Right

RetamaCHCurvePlate.jpg
Curved Wall Plate

RetamaCHCurveBack.jpg
Curved Wall Back

Plumbing Etc.
 
Plumbing has been roughed in with PEX. A 150amp electrical panel was installed to support the on-demand water heater for the hot tub. There are elcetrical sockets on the outside of the building, and it was pre-wired for cable TV, washer dryer hookups, and a fridge, should there ever be a need for any of them.

Tub Area
 
In the screen porch in the front, I have installed a 2-person whirlpool tub. Perfect for a water massage after a long bicycle ride. It has a stone apron and is about 50% complete.

RetamaStoneTubApron.jpg
Tub Stone Apron

RetamaTubTest.jpg
Tub Test

RetamaGardenRight.jpg
Right Side

RetamaWholeThing.jpg
View from Tub

The tub area will have an indoor tropical garden behind and beside the tub, a built-in bench in the corner, and be covered in natural stone veneer.

Relaxation Room
 
In the space behind the tub area, there is a relaxaion space. It will feature sconce lighting, a full height wall fountain, and inlaid stone tile flooring. This is where the work will start in October 2009.

RetamaTVFountainWall.jpg
Television Wall

RetamaSittingArea.jpg
Sconce Wall

RetamaTileInlayDetail.jpg
Tile Looking Out

RetamaTileInlay.jpg
Tile Looking In

One of the key features of the whole project is the arched opening in the curved wall. All of the sub-structure for this has been completed. Next up is to laminate stoneboard to the substructure, then cover it in stone veneer.

RetamaArch2.jpg
From the tub side

RetamaArchInCurvedWall.jpg
Arch and Curve

RetamaArch.jpg
From the sitting area

Stone Work
 
Stay tuned....