Planning the Sewer System
The sewer system planning consisted of getting a set of specifications from the building code enforcement officer, and
having a perk test done. The perk test passed and the sewer system will be installed as shown on the original plan.

|
| Camp Agnolo Architectural Drawing |
What's Next
Road construction and storm water mitigation have to be completed before any work can be done on the sewer system.
|