Drafting/Drawing
Coordinator
1997
to Present
CADD Specialist with hydroelectric and thermal power experience,
including detailed layouts, arrangements, cost estimates, development of project drafting standards and preparation of multidiscipline
drawings using AutoCAD®.
Project responsibilities include:
- preparation of feasibility study drawings showing flow control options including
power generation from a new 48" raw water supply main in Nevada County, California
- coordination/preparation of design drawings for new unit powerhouse, water
conveyance, rackhouse upgrade and exist powerhouse modifications for RG&E Station No. 2
- coordination/preparation of design drawings and document control of
115kV and 345kV substation upgrades for Central Maine Power
- coordination/preparation of design drawings for tunnel religning at RG&E
Station No.5 Headworks
- coordination/preparation
of arrangement drawings for diversion dam/intake, desander, reservoir, power tunnel, power house and tailrace for Hydro Xaclbal,
Guatemala
- assistance in preparation of general arrangements and concrete reinforcement design drawings of a
single unit horizontal turbine powerhouse at 3 sites for North American Hydro, Arkansas
- assistance in preparation of standardized spreadsheet
format data check sheets for the unit upgrade quality plan manual at the St. Lawrence-Franklin D. Roosevelt Power Plant for
New York Power Authority, New York
- coordination/preparation of multi discipline design drawings and document control of gaming alterations
project at Batavia Downs for Western Regional Off-Track Betting, New York
- coordination/preparation of multi discipline detailed design drawings and document control of spillgate
and service bridge replacement project for Rochester Gas & Electric Station No. 5, New York
- assistance in preparation of standardized spreadsheet format data check sheets for the unit upgrade
quality plan manual at the Robert Moses Niagara Power Plant for New York Power Authority, New York
- preparation of drawings of selected components for Units 5 & 6 turbine rehabilitation at the Upper
Bonnington power plant
- coordination/preparation of detailed design
engineering, fabrication/ placement drawings of civil foundations, including GTG, inlet structure, exhaust and stair tower
of one new GE Frame 9FA simple-cycle gas turbine generator at two different sites with a total nominal capacity of 230‑MW
(each site)
- preparation of balance-of-plant detailed design
engineering drawings of two new GE Frame 7EA simple-cycle combustion turbine generators (CTGs) with a total nominal capacity
of 300 MW
- preparation of balance-of-plant detailed design
engineering drawings of four new GE Frame 7EA simple-cycle CTGs with a total nominal capacity of 150 MW
- preparation of detailed design engineering
drawings for sitework, including roads, grading and drainage system, including sediment basin and soil erosion control for
greenfield site of two GE Frame 7FA simple cycle gas turbine generators with a total nominal capacity of 300 MW
- preparation of conceptual level general arrangement
plot plans for multiple Greenfield thermal developments incorporating four GE Frame 7FA units at each site (multiple sites)
with a total nominal capacity of 600 MW at each site utilizing aerial photography, surveys and topographic mapping
- assistance in markups and preparation of design
drawings for Erie Canal Lock E-2 and Lock E-33 miter gates, New York
- assistance in data collection and data input to 3D model drawings of concrete crack mapping at the
Robert Moses Niagara power plant for New York Power Authority, New York
- preparation of expansion alternatives, including site plans, powerhouse layouts and water conveyance
for San José hydroelectric project, Bolivia
- preparation of principal structure general arrangement drawings and assisting in cost estimates for
the Puerto Pobre reservoir feasibility study in Peru
- preparation of existing conditions and expansion alternatives including site plans, powerhouse layouts,
and water conveyance for the Corani and Santa Isabel hydroelectric projects’ evaluation of expansion
alternatives, Bolivia
- preparation of modification drawings for trashrack structure deck and trashrack for Hudson
Falls hydroelectric project in New York
- preparation of retaining wall remediation drawing for Warrensburg hydroelectric project in New
York
- preparation of penstock valve modification drawings and figures, submittal documents and drawing coordination,
preparation of arrangements and detailed layouts of design drawings for Cañon del Pato hydroelectric project in Peru
- assistance in final markups and preparation of design drawings for Washington Water Power in Washington
State.